There are five important steps to a successful solar energy installation by your selected solar company, and your chosen solar installer will usually follow: 1. Engineering site investigation. The initial site visit usually includes determining the amount of sunlight, which is a major consideration in any solar project, and then determining whether or not the site can support solar panels.

Once the site investigation has been completed, the next step in solar panel installation is to determine the best location for the solar panels. If possible, the installer will want to ensure that there is plenty of south-facing sides for maximum solar exposure. For best coverage, the installer may need to relocate some or all of the electrical wiring from the existing power distribution. Next, a site visit to the city or county building code office will be made to determine any zoning restrictions. Most jurisdictions require at least a minimum of 4 square feet of unobstructed front space for installation, so it is very important to get a final site plan and all the relevant measurements. If the property does have existing electrical wiring, there may also be additional zoning requirements in addition to the standard requirements for front space. Visit page to see how much solar panel installation would save for you.

When installing solar panel installation on roofs, a minimum of a 4-inch pitch is required. In many states, grade C and D wood surfaces are approved for residential applications, but check with the local climate for the specific requirements. After the panels are mounted on the roof, the installer will need to prepare the roof for installation. Solar installers should always work in a clean and dry area, as moisture can lead to frame stress and cause a ripple effect down the line. As with any other roofing system, it is a good idea to use high quality roofing materials such as shake, tiles and cedar shakes to avoid moisture problems.

Next, the installer will install gutters over the roof to channel rainwater away from the panels. The gutters should run parallel to the surface of the panels. They should slope slightly downward to help prevent rainwater from pooling on the panels during high wind conditions. Once the gutter systems are in place, the solar panel installation on the roof can begin. The panels should be installed according to the manufacturer's instructions and attached to the side of the house or building as close as possible to the structure of the home. The best way to install panels is in a straight line, using long screws. Visit this link: https://blueravensolar.com/virginia/virginia-beach/ to take advantage of current offers for solar panel installation services.

There are some state and local regulations regarding solar panel installation processes and locations. A good installation and design company will have this information available for you. For example, in the state of California, a minimum of 4 square feet of unobstructed front space is required, while in the state of New Hampshire, a maximum of 12 square feet is deemed optimal. Also, while the New Hampshire laws do not allow the panels to be installed on slope fronts, the solar installation process can still be successful if the panels are attached at an angle.

As with any installation project, it is recommended that you hire a reputable solar panel installation and design company that have ample experience in this field. You can learn more about good contractors by doing a little research online. Remember, installing solar energy panels is not difficult and can greatly reduce your electric bill costs. This post https://en.wikipedia.org/wiki/Photovoltaic_system
elaborate more on the topic, so you may need to check it out.

All Posts
×

Almost done…

We just sent you an email. Please click the link in the email to confirm your subscription!

OKSubscriptions powered by Strikingly